January 18, 2007, 12:13 pm
Does anyone have recommendations for an AGV supplier? The system will need
to interface to AB and Siemens controllers, as well as an RFID system. Path
control will have to be by laser or other non-floor-changing technology
(i.e. no tape strips or in-floor wires or other devices)
Good experiences as well as bad, pitfalls to watch for or any other
knowledge regarding these vehicles would be appreciated.
--
Anthony
You can't 'idiot proof' anything....every time you try, they just make
better idiots.
Remove sp to reply via email
Site Timeline
- » Phase Cut or Phase Chop control
- — Next thread in » Industrial Control Group
-

- » Pole-zero pair, measurement
- — Previous thread in » Industrial Control Group
-

- » Measurement validation for process signals
- — Newest thread in » Industrial Control Group
-

- » What is it? Set 442
- — The site's Newest Thread. Posted in » General Metalworking
-


