The toughest part of this job was inside the cast iron housing. The pivot joint on the 6125M fender mount had real play in it, and once the inner pivot pin and torsion spring came out, the maker found severe step wear and galling in the bore. The galling even matched the grease groove pattern of the shaft, which is a striking bit of evidence of how the joint had been running. The fix was to machine the damaged upper and lower bores out concentric to each other and make replacement sleeves from tubular steel stock.
The teardown looks methodical. Ratchets, wrenches, a vise and a ball-peen hammer got the bracket apart, then everything went through a solvent wash basin. A flashlight and a probe were used to inspect the housing bore, and a file hardness test settled the material question: the shaft is hardened steel while the cast housing is soft. That contrast seems to me the key detail of the whole repair.
The machining side is where this shines. The housing was clamped in a machine vise with the reference face indicated, and a Bridgeport vertical mill with a boring head and automatic quill downfeed cut the bores. A telescoping bore gauge and an outside micrometer verified the dimensions. On the lathe, fitted with a DRO II-2L digital readout, a TNMG 16 carbide insert turned the sleeve outside diameter to roughly 49.15 mm, checked with vernier calipers and a micrometer. The machined edges were deburred by hand, and the sleeve's leading edge was chamfered ahead of drilling and internal boring.
One thing left open: the record ends before the sleeves' drilling and internal boring, so the final fit and reassembly are not shown. I would genuinely like to see how those sleeves end up seated against that soft casting.
Project by Handmade Extreme. Watch it on their YouTube channel: