Finished my first indx build

Nov 22, 2026 Last reply: 53 seconds ago 6 Replies
Jump to replies (6)

So for anyone on the fence about the indx upgrade or buying one outright, my two cents is do it. Finished my first indx machine yesterday and I couldn't be happier with how it turned out. The build itself was really simple and the documentation is good, everything makes sense as you go. Vented top cover on mine, added some internal LED lighting, and I've got the filament spools sitting on a rack right above it. Fits in nicely next to the CORE ONE+ units on the bench and the shelf.



One tip for anyone starting out: just take your time and do the calibrations carefully. That's really the whole secret. Rushing that part is where people trip themselves up.



Everything runs fine and flawless so far. Really happy with it.


I built mine a while back and can back up your advice about patience. Squaring the gantry and getting the belt tension right took me several attempts before the upgrade ran the way it should, so anyone whose first try feels off shouldn't be discouraged. It settles in once you get those two things right. The early units had some teething problems, mine included, but after the first few weeks it's been flawless through thousands of successful tool changes. If anything on mine ever acts up, it's the toolhead. The newer replacement toolheads are much improved over the first batch, so if you ever end up swapping one, that alone makes a noticeable difference.

The biggest day to day challenge for me is keeping a growing pile of filaments dry, and a dedicated storage solution took that headache away. The way you've got spools racked above the machine is a nice use of space. From what you describe with the vented cover and the lighting, it sounds like it came together exactly as it should. Enjoy it. Once past the setup fiddling, it just prints.

I went the upgrade route on my existing machine instead of building the whole unit fresh, and honestly the calibration stage felt bigger that way because you're redoing things that were already set up. Took a few passes on my end but once it clicked it just kept going. What nobody warns you about with a multi-tool setup is how much dry filament matters. I keep the spools in a sealed storage box between jobs and run a dryer box when I'm doing longer runs, because a damp spool turns a perfect tool change into a stringy mess real quick. The way you describe your setup, with the spools right there on the rack above the machine, is tempting for convenience but that's the part I'd watch, especially in a humid summer. Does the vented top help enough with heat that you'd run PETG in it all day, or do you find the chamber warms up past what you'd want for PLA? I'm genuinely curious because I haven't decided on an enclosure for mine yet. Either way, glad it's printing clean for you right out of the gate.

Curious how the LED lighting worked out for you. I keep meaning to do the same on mine but haven't pulled the trigger yet, mainly becasue I'm not sure how bright I'd actually want it. Did you go with strips or something else? Sounds like it makes checking prints mid-run a lot easier than squinting thru the cover.

Also good to hear the docs held up. I'd heard mixed things early on so it's nice that the newer ones seem to have it sorted.

The calibration advice is the part I keep repeating to friends who ask about mine. When I was deciding whether to pull the trigger, hearing that the build was simple and the docs made sense is honestly what got me to order, and I've had no regrets since. Agree completely that once you're through setup it just prints. Out of curiosity, is the vented top cover something you added yourself or does it come as part of the kit? Been wondering about doing the same on mine.

On the calibration advice, I'd restate it a bit more carefully for anyone reading: it means every step gets done fully and in order, not just the ones that look obvious, and skipping an early one is what tends to cause confusion later rather than anything actually wrong with the build. The way you describe the finished setup, spools racked above the machine and sitting next to the CORE ONE+ units on the bench and the shelf, sounds like a tidy arrangement. Out of curiosity, does the rack above the vented top cover stand on the cover itself or on its own frame?

Update: still running perfectly a day on. To whoever asked about the LEDs, yes it makes checking prints mid-run way easier, no more squinting through the cover. And to the folks who said squaring the gantry and belt tension can take a few tries, good to know. I took my time on those and it paid off.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required