I just added a second U1 to the garage so I can run bigger multicolor jobs without babysitting spool changes. Two machines side by side on the same bench, both feeding multiple colors, and the total for the pair still came in under what I was quoted for one of those high-end multi-color machines with the big AMS setup.
Honestly I did the math twice because I didn't beleive it the first time. The thing I'm not sure about is workflow. Is anyone running two U1s side by side and splitting a job across both, or do you just queue them separately? I've been sending one file at a time and it feels like I'm wasting half my capacity. Also curious how people handle filament. I've got red and white on one and the same on the other, and I keep mixing up which spool goes where when I swap. Do you label the tubes or just sort of remember which unit has which material loaded? Minor thing but it's bitten me twice already.