Are there any guide lines on the loading action on a trash screen to be used for the design and sizing of the screen supporting structures? Such as the minimum amount of clogging of the screen causing water pressures to act on the screen
Thanks..
-- Regards,
Home Page :Tips for Excel in Engineering Applications
formatting link