I would love to have a nice telescoping heavy gantry crane, but I don't need one often enough to pay the price for one as heavy as I would like. I do have a metal building with a large I-beam across the center. The building is 60' outside dimension, but the unsupported beam (bolted together in the middle at the peak with large flanges) is about 55 feet eyeballing the dimensions. Maybe less. The incline is about 4 degrees.
I'm playing with the idea of putting a beam clamp on the I-Beam and putting a chain fall on it about 8 feet from the support column on that end. With a 16' eve height a 15' chain fall should allow for laying the hook on the floor. Mostly it would get used for outboards, small blocks, and maybe the occasional big block engine. All under a half ton, but the immediate thing that got me thinking about it is the Bridgeport Series 1 CNC mill on a trailer in the shop right now. Depending on where I look it weighs between 2000 and 3000 pounds. The spec sheet I am most likely to trust puts it at 2600 pounds. Its not overloading the tires or the axle on the trailer I hauled it on. That trailer has a single 3500lb axle, but a few years ago when I hauled ten sheets of 1/4 inch A36 it was very close to max for the rig. That would have been around 3264 lbs. So the mill has to be significantly less than that. I have heavier trailers, but one is high deck and one has rails.
My thought is the beam is certainly heavy enough if it was a short span like a gantry crane, but being a 55 ft span I might be playing with fire if I were to try a heavy lift near the middle. I am hoping near the end more of the load will be vertical on the support column.
In order to avoid slipping I'd put the type of beam clamp used with all thread to support conduit, ducting, and sprinkler lines on the bottom flange of the beam on the downhill side of the lifting beam clamp on each side.
It would be a single (more or less) short duration load so that I could lift the mill, roll the trailer out from under, and lower the mill onto a heavy pallet, so it can be positioned with a pallet jack and eventually set on the floor with my cherry picker (engine crane). The last part is how I moved, positioned, and set the South Bend mill (which is over 3500 pounds). The cherry picker won't go high enough to lift the mill off the trailer.
I don't know how dumb my idea is, but I'm probably going to go for it. The load time would be measured in a couple minutes, but my thought is something like this is either going to be strong enough. Or it isn't.
How did I unload the Hurco (4000lbs) you might ask? Yeah, that wasn't pretty, and I don't have all of that equipment anymore.
It it works I'd leave everything in place, and just swing the chains over out of the way behind a hook on the support column.