Most MPC packages (Profit Controller, DMC+, SMOC) shows steady state value on their control view. What is the significant when the steady state does not trend with the actual measured value. I'm referring to the Controlled Variable.
Most MPC packages (Profit Controller, DMC+, SMOC) shows steady state value on their control view. What is the significant when the steady state does not trend with the actual measured value. I'm referring to the Controlled Variable.
Have something to add? Share your thoughts — no account required.
Ask the community — no account required