First of all the derating is based on load. if you considered the load = with your calcs then that is good. Second is that you can not cut strands = from a cable for a multitude of reasons. The building inspector might not even = see it but if the electrical inspector is aware you will fail. Why don't you step up to copper wire? RAK
- posted
19 years ago