The trickiest part of this build has to be getting clean ventilation openings into 2 mm sheet metal, and the maker took a thorough route: the plasma torch was mounted on an automated arm driven by a touchscreen controller, which cut the hexagonal openings in the vented panel. A shelter for an outdoor heat pump sounds simple, but this is real fabrication work, and the setup reflects that.



The frame is square steel tubing, laid out as a gabled shape on a welding table with magnetic squares holding everything square. Tacks went in with a MIG machine in spot-weld mode before the joints were fully welded, and then ground flush with an angle grinder. Before any of that, tubing lengths were cut with a stopwatch comparison between an angle grinder and the plasma cutter, which I think is a smart way to settle the question properly.



The details that stand out for me are the small ones. Flat metal spacers position the vented panel inside the frame, and it is held with spaced fillet welds along the interior edges, which should keep the outside faces clean. Small square caps, cut on a CNC plasma table, close off the open upper tube ends and were welded on and smoothed down. The process was repeated on the opposite side with a solid panel, so the whole thing looks consistent from both angles.



The project is still in progress. The plan from here is to sand and paint the frame and fit wooden roof boards into the slatted roof design. That leaves the finish and the roof as the open chapters, and I will be curious how the timber sits against the painted steel.



Project by Make & Test. Watch it on their YouTube channel:

formatting link


Spacing the fillet welds along the interior edges of the vented panel strikes me as the cleverest choice here. It secures the sheet without putting a bead across the visible face, and with the spacers setting the gap it should have gone in square. The trade-off is more welds to place, but for a housing meant to be painted that seems worth it.

Question about the tubing cuts: the stopwatch comparison between the angle grinder and the plasma cutter sounds useful. Did the timing alone decide it, or did cut quality factor in as well? I would like to know which method won on the tubing and whether the plasma edge needed any grinding before the tacks went in.

A variation worth considering for the roof: instead of solid wooden boards, leave narrow gaps between the slats the same way the hexagonal panel vents the sides. Warm air could escape through the top as well as out the vented panel. It would suit the slatted design already planned and keep the timber theme while adding airflow at the highest point.