Well, at the promptings of a few friends, I called my local power company today. Turns out they will have an engineer evaluate whether or not they will supply 3 phase power, at no charge to me. So I guess I'm going to try it.
Plus sides: If I'm reading their tariff documents correctly, as long as they don't have to go more than 500 feet from their supply, they don't charge the customer bringing the power to them. The pole that supplies my place has 3 phase terminating at it. It is about 200 feet from my garage.
Down sides: They require a minimum 10Kw demand. I'm not really clear how they measure this. The motor on the compressor is theortically 11Kw, but I'm not likely to be using it for all that long durring the course of a week. Also, I'm not sure what the fees they do charge for hookup are, though they said they will disclose them before any work is done. Also, I'm not sure how they will charge for the power usage. A combination of power plus peak usage may be nasty.
Anybody here ever done this, and any recommendations? I do have an electrican who is marrying into the family who does side work like this and has reasonable rates, and is willing to inspect my work.
Thanks! Todd