Hi all,
For mains adaptors with LV DC outputs, is a visual/operation inspection all that is needed to satisfy PAT testing requirements?
Thanks
Hi all,
For mains adaptors with LV DC outputs, is a visual/operation inspection all that is needed to satisfy PAT testing requirements?
Thanks
No, you need to check insulation between the mains side and the DC output. There's a lot of good information on Seward's site.
Sorry, that's the name of a friend of mine, I should have said Seaward's.
double ins....flash test and visual....
Thanks for the replies
Have something to add? Share your thoughts — no account required.
Ask the community — no account required