------------- Fair enough but if the information gatherer gives you something that is out of line for the size and type of transformer, it is nice to have an idea of what is reasonable. As a PE, I should think that questioning of out of normal data is a given.

Everything seems to be reasonable. The size description of #2 instead of #2/0 is most likely a slip of the pen. The biggest unknown at this time is the short circuit properties of the supply transformer. I explained why that was important. So far, I have heard no more. That is OK with me.

Most of my electrical engineering has been in situations for which the Industrial Exemption is usually in force. I have nether pushed my PE except for some puffing when I did a bit of consulting.