Yes, it does, they often need to have better qualifications than the original designer. At least here in Sweden it works like that. And they would have to appear in court.
The bridges around here at least are designed in that way, and people do their job most of the time. The oldest ones still around are usually railroad bridges, since the load has not increased that much, steamengines were quit heavy. Some loose rivets have to be replaced, but that is about it. =20
But they do not have a design lifetime as long as that of the bridge.
Fatigue it self is unavoidable but it must not be allowed to cause any problems during the expected lifetime of the bridge. A structure and its details can be more or less fatigue prone, less is to prefer for a bridge.
And maybe did more that that.
We will see what caused this collapse.
It does not need to last forever only the design lifetime.
I like maintenance! But I usually think of maintenance as the work that is know from the start to have to be carried out during the expected lifetime. Replacement of parts, reinforcements or other improvements needed as a result of problem with the design, heavier traffic than expected or what ever is something else, even if necessary, but not maintenance of the bridge.
Yes but it can be more or less difficult to take care of.
I would not like to have a car that needs a new engine every now an then because it gets fatigued. That the manufacturer did not take fatigue in to account, even though it has been know how to deal with it for 200 years, would I see as a problem.
But you would not mind I guess! Not ever after the third engine replacement the same month would you complain, it is only maintenance!
--=20 Mvh Anders Lager=E5s