The detail that caught me off guard is the order of operations. Before touching anything on the original hardware, the maker turned a temporary stud from aluminium round stock, threaded it M16 and gave it a 35 mm flange so it seats in the compound slide recess. That kept the lathe in service while the real work happened, which strikes me as very disciplined planning for a hobby shop upgrade.
The core problem was a mismatch: the Multifix size A post, labelled PWT-A, has a 26 mm bore while the mounting stud on the AMABL290F measures 24 mm. The solution is a three-part rework. The original steel stud had its register turned down to 20 mm with a grooving tool, a sleeve was parted off a 30 mm EN24T bar with the bore opened to 20 mm and the outside turned to 26 mm, and a dowel hole was spotted, drilled at 5.5 mm and reamed to 6 mm on a benchtop drill press. The post was lined up on the slide with 1-2-3 blocks, and the top washer was bored out to 16 mm in a four-jaw chuck.
One setback stands out too. The EN24T stock blunted a high-speed steel bit early on, so indexable carbide holders, including MGEHR1616-2, SCLCR1616H09 and Kyocera ACLCR1616JX-09FF, were brought in and finished the sleeve. Swapping to carbide mid-job rather than fighting the material seems like the right call to me.
The reassembly stacks the original stud, steel sleeve, dowel pin, tool post and tightening handle, and the closing moments demonstrate a tool holder being dropped in and locked. The maker reports everything now fits perfectly after the extra work. My open question is why not simply cut a complete new steel stud instead of the temporary stud, sleeve and modified original route, since that path involved three separate pieces.
Project by This Designed That. Watch it on their YouTube channel: