When the Cement guys poured the Stemwall, they didn't secure the 3" feed conduit to the Side of the Wall and it sticks out into the Garage. Then to top it off, the Contractor didn't layout the Studs to match up with the placement of the panel.
Now I'm stuck with a Panel that has a conduit that is 5" off from where it can go. Since there is a 6'6" Height Limit for looking at the Meter from the outside it only gives me about 18" to get the 5" offset.
We tried to bend our one 3" Schd40 conduit with a hot box and could only get a bit more then 3"
Is there a Piece of Flex or something that we can get to connect the Conduit to the Panel?
Thanks!