After years of looking, finagling, trying and missing, we have a building. In the front is a 1500' office suitable for leasing followed by a 1400' garage w/overhead door. Behind that is a 1900' warehouse with 16' clearance to ceiling. Across the back is a 10'000' two story cinder block box that will become the biz, the shop, the home and the wife's studio. All the buildings are attached so I can move equipment from the warehouse into the building. Upstairs, we get 3000' for the house and SWMBO gets a 2000' studio for here projects. Downstairs, the computer biz gets about 1500' and the rest becomes a metal shop, wood shop and whatever else. In the shop area ceiling already is a hoist rail loop about 65' long and 15' wide with about 20 rollers on it. At first, I only found single phase bboxes in the building, then found a 200 amp
3phase Delta fuse box. The pallet rack should be up this week in the large w/h so I can began moving stuff (tools and parts). I've been gathering tools and such for years and they are scattered in MANY places. Finally, a home for all in one place! All I have to do is survive the next few months. There is a God, He is good, and I am grateful. Respectfully, Ron Moore- posted
20 years ago