Dear friends,
wht is the maximum mismatch allowable after welding , when we check on the OD?... where its was given in section ?...
Regards sankar.k
Dear friends,
wht is the maximum mismatch allowable after welding , when we check on the OD?... where its was given in section ?...
Regards sankar.k
Dear friends,
wht is the maximum mismatch allowable after welding , when we check on the OD?... where its was given in section ?...
Regards sankar.k
what you mean isn't very clear (well at least to me!)
I think he means High/Low in pipe fit-up.
The maximum High/Low is specified in the engineer's drawing or written instructions.
It varies by pipe size, wall thickness, and certification required.
Have something to add? Share your thoughts — no account required.
Ask the community — no account required