Don,
My thinking exactly, sir! :)
I thought about a truck/truck transfer, but will probably go the ground and hoist route.
Dumb question: any trick to keeping the pull from simply tearing apart the pallet? One thought I had was a 2x4 shoved in the pallet and a sling over it up to the hoist - that should get it going, assuming the wood can take it.
Good to know. At the risk of appearing to cross-examine (in reality I simply want to understand to get the most out of your helpful descriptions), unload from the _pickup_??? Would you still have done the ramp transfer, or would you have gone flatbed-ground-hoist?
Ok, now I'm starting to think that you would have done the ramp between the two trucks, and then used to hoist from your pickup to the ground. Is that it?
I still do not quite follow (sorry). Unless the idea was to lower onto cribbing to have stable foundation while you unbolted the pallet? I am assuming that you slung the lathe, and the pallet is just along for the ride; one could then unbolt with the whole thing swinging, but it would be very dangerous to do that - the load could fall, or shift and then fall as the pallet does weirdness being partially attached to that lathe. However, I would probably leave the hoist holding some tension on the lathe, just in case all hell broke loose with the pallet while I was unbolting it.
Scary thought, but I get the idea.
Please be careful, as my evil twin is the one who buys all this stuff; I am fairly certain he settled for a keyed chuck :) Humor aside, I might be in for a pleasant surprise, but I was trying to balance price and quality, and the Enco tech suggested the Rohm as a worthy compromise. Worst case, it will become a backup to my Jacobs.
I bought my last Jet machine a couple of years ago. The clincher was when I called them to point out that they had an safety latch that needed to remain in place bolted at one point, and that it would eventually pivot. Nutty me, I thought they would want to know - they didn't care, nor did they seem to even grasp how stupid the design might be, nor that they might want to find somebody who might understand same. Anyway, it *did* fail as I predicted.
Great minds... I fully expect to go that route, I just have to slow down the flow of green stuff out of my wallet for a while. If the Phase-II is anything like the RT they make, it will be very much worth the money. I assume/hope that I will be able to function with the existing post while I fumble my way along with learning what the new toy can do. After I recover from April 15 and brace for the local guys mugging me later in the year, I can start looking for sales.
That is what I did. One of the parts is a singleton, but I would no doubt give it a shorter peer to help stabilize it. The other reason to cut two at a time was that I wanted them to be the same length, whatever that turned out to be. Now that I think about it, if I put that improvised stop in the center, it should be able to work for both tubes, allowing me to the lengths the same - I think :)
Dumb question: after the first cut puts the machined surface right at the edge of the tool, right? Would not a stop set against it (firm but not deformed) be in just the right place w/o moving the table? I need to read it a few more times, but you appear to have added a step. What does that fix?
Thanks!
Bill