Hi,
I've been reading posts until I feel I can never read another again! My poor eyes. What I decided to do is to retro-fit metal KD couplers on all my rolling stock and then uncouple by hand if the uncoupling causes me undue grief. I only have 5 turnouts on my 4 x 8 layout anyway! If it doesn't cause me grief, all the better. I don't care if they do not look real either. This after reading a zillion posts of complaints about couplers.
But as yet I have not decided which way to go on the layout bed...again, after reading posts of good/no good foam, good/no good glue, good/no good whatever, for days now!!!! I gave up and already built a grid for my 4 x 8 layout. Starting with (2) 1 x3's x 8', to which an upright 1x2 is glued and screwed, forming each of the 1 x 3's into L-beams. Across the L beams, perpendicularly, I attached 1" x
2"'s, upright, a foot apart, extending 6" beyond the L bems on both sides of the grid., The glued and screwed 1 x 2's cross beams form 4 x 8 gridwork. Now, I either cut 3/8th" plywood to follow the layout and attach the it to the grid work. As to elevated track I plan to use risers attached to the 1 x 2 cross members. Splicing the 3/8th ply is a hurdle I must consider....perhaps using metal plates from Home Depot and 3/8th's inch wood screws.
Before I begin the 3/8ths plywood sub-roadbed, I still wonder whether a layer of foam might be better, using foam for the elevated roadbed as well, and cork subroad-bed. Decisions, decisions, decisions!!!
I wonder whether I'm really going wrong using the 3/8ths sub-subroadbed. Or, going wrong by not adding a sheet of 2"red or blue foam the the gridwork and forming the elevated road bed out of foam.
Thanks for being my sounding board!