dwt and dwg

What is the difference in the 2?
Currently, I have a base sheet dwg with everything set up. It is in a central location, and whenever anyone starts a new project,
they open the base sheet dwg and do a save as to their computer and begin working.
What are the benefits of using a dwt over the dwg?
Thanks, jojo
Add pictures here
<% if( /^image/.test(type) ){ %>
<% } %>
<%-name%>
Add image file
Upload

Polytechforum.com is a website by engineers for engineers. It is not affiliated with any of manufacturers or vendors discussed here. All logos and trade names are the property of their respective owners.