sp 1.0 change to PDM?

"Determine a way to specify what is and is not considered a revision change during initial check in to the vault"

From the list of fixed SPRs for 2006 SP1.0. I have wanted such a feature for as long as I've used PDMworks. Its on the fixed list, but I can't see any changes within pdmworks as far as options go nor any reference to such within the help file.

Has anyone found how to access the feature?

Reply to
Brian
Loading thread data ...

PolyTech Forum website is not affiliated with any of the manufacturers or service providers discussed here. All logos and trade names are the property of their respective owners.