```````` Feel free, as always, Matt.
Two things I want to add...one I forgot to mention before, the second is something I just thought of/remembered.
The first is, my layout plan also is designed to operate point to point with a continuous run option as suggested by others. The continuous run section is connected to a wye junction. If you take the wye to the left, you will go in a circle around the double track mainline. In normal operation you wouldn't use that leg of the wye, though. Instead you would use the right leg, which goes into/comes from a staging yard back in the dispatcher's area.
The other thing I thought of...you might want to consider building a small operating area of the layout, or some scene, as a removable module built to one of the modular standards. That way you can increase your fun in the hobby and this section can do double duty -- it can serve as part of the layout, or it can be removed and taken to public shows and/or joined with other modules if you have a modular group in your area. I thought of this early on in my layout design, but wasn't able to work it in. Also, at the time our local informal, round robin group was starting a module group, but it fizzled and died.
I have another post of yours to write up a response to but haven't gotten to it yet. It's the one where dispatching and fast clocks were mentioned. If I don't get to it some time tomorrow (well actually later today as it's now 1 am as I write this), I want to be sure to wish you and the family a very happy Thanksgiving.
"Talk" at you later.
Paul - "The CB&Q Guy" (Modeling 1969 In HO.)