First thing I'd flag, since these sound like emergency exit doors, is making sure the exit device setup stays code compliant with the motorized mortises in the mix. Egress doors with panic hardware usually need to keep working as a plain push-to-exit even with all the electric gear added, and it's the kind of thing an inspector will look at closely. Worth confirming now rather than after the remaining doors are done and everything is signed off around it.
On the weather question, I've never run electric locks fully exposed myself, so no hands-on answer from me, but a nook with no roof over it is exactly where I'd be nervous too. Motorized mortise bodies have electronics and moving parts that indoor hardware just never has to deal with, so I'd be curious whether the units you picked are rated for outdoor exposure or whether you're genuinely in wait-and-see territory like you said. The cable tray and wiring running into the frame would be my other worry in driving rain, though I'll leave that to the electricians here. Sounds like a satisfying job overall though, and getting six of them done with more lined up is no small feat. Keep us posted on how they ride out the first real storm, that's the part I'd want to hear about.