Many thanks to all respondees -
I now have 4 lifting eyes installed and awaiting a hiab (thanks Michael)
AWEM
Many thanks to all respondees -
I now have 4 lifting eyes installed and awaiting a hiab (thanks Michael)
AWEM
Good job I checked in on the group while at work this morning. Now I'll take the two that I stole back out of the jiffy bag and put them back in the stores and also replace the two in the top of my grinder. You came within 10 minutes of getting some spares posted to you.
Mark Rand RTFM
message
Mark,
Very many thanks !
Andrew
ps have you fitted the Diaform and top dresser yet?
Not yet... I'm still working on the ML7 stand. Once I've finished that and got the ML7 (ex-father's long bed ML7B) running, I can assemble the rotary convertor that'll give me three phase until I can buy some from the leccy board. Then once that's done it's a choice between :-
1) Re-commission the grinder. This needs the hydraulic pump motor repairing/replacing that I know of. 2) Re-building the milling machine. This needs a complete rebuild and reconditioning from the column to the head.Once I've got some three phase I'll probably investigate the grinder since I suspect that I've got some serious gear cutting tool and gib grinding for the Mill refurbishment.
regards Mark Rand RTFM
rotary
grinding for the
So what are you doing in the afternoon
AWEM
PolyTech Forum website is not affiliated with any of the manufacturers or service providers discussed here. All logos and trade names are the property of their respective owners.