5/8" lifting eyes

Apr 27, 2006 24 Replies

Many thanks to all respondees -

I now have 4 lifting eyes installed and awaiting a hiab (thanks Michael)

AWEM

Good job I checked in on the group while at work this morning. Now I'll take the two that I stole back out of the jiffy bag and put them back in the stores and also replace the two in the top of my grinder. You came within 10 minutes of getting some spares posted to you.

Mark Rand RTFM

message

Mark,

Very many thanks !

Andrew

ps have you fitted the Diaform and top dresser yet?

Not yet... I'm still working on the ML7 stand. Once I've finished that and got the ML7 (ex-father's long bed ML7B) running, I can assemble the rotary convertor that'll give me three phase until I can buy some from the leccy board. Then once that's done it's a choice between :-

1) Re-commission the grinder. This needs the hydraulic pump motor repairing/replacing that I know of. 2) Re-building the milling machine. This needs a complete rebuild and reconditioning from the column to the head.

Once I've got some three phase I'll probably investigate the grinder since I suspect that I've got some serious gear cutting tool and gib grinding for the Mill refurbishment.

regards Mark Rand RTFM

rotary

grinding for the

So what are you doing in the afternoon

AWEM

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required